1© 2012 Suncast Corporation, Batavia, IL 0361173BEasy Bolt Easy DriverINCLUDED IN KITINCLUS DANS LE KITINCLUIDO EN EL KIT010210410 Tools Needed for
10Door hingeCharnière de porteBisagra de la puertax4BBDoor latchLoquet de portePestillo de la puertax1IIDoor latch housingBoîtier de loquet de porteCa
11 Site Preparation and Platform Construction Materials NOT supplied with Shed Kit Note: Site preparation is recommended for this shed. Placing the
12Item Qty Sizea 1 51 1/2" x 31 1/2" x 3/4"b 4 2" x 6" x 10 1/4"c 2 2" x 6" x 51 1/2"d 4 2" x 6"
13130,81 cm(51 1/2 po)80,01 cm(31 1/2 po)• Fixez la remise à une dalle en béton à l’aide des attaches de maçonnerie.• Les dimensions permettent à l
14Espacement du faux cadre6,67 cm (2 5/8 po) 8,89 cm (3 1/2 po) 4,44 cm (1 3/4 po)34,92 cm (13 3/4 po) 127 cm(50 po)101,6 cm(40 po)12,7 cm(5 po)17,8 c
15130,81 cm(51 1/2 pulg.)80,01 cm(31 1/2 pulg.)Anclaje del panel de piso a la losa de cemento130,81 cm(51 1/2 pulg.)34,92 cm(13 3/4 pulg.)72,39 cm(28
16Espacio en el bastidor auxiliar6,67 cm (2 5/8 pulg.) 8,89 cm (3 1/2 pulg.) 4,44 cm (1 3/4 pulg.)34,92 cm (13 3/4 pulg.) 127 cm(50 pulg.)101,6 cm(40
17Très important : lors de la pose des panneaux latéraux, repliez plusieurs fois les charnières d’angle d’avant en arrière. Ceci vous permettra d’obte
18Assembly–Walls (continued) / Ensemble de la remise–Murs (suite) / Armado del cobertizo–Paredes (continuación)21Vue arriére/Vista traseraRear view/Vu
1912B4Tip left side panel (B) outward slightly and bend the corner hinge.Inclinez légèrement le panneau latéral gauche (B) vers l’extérieur et pliez l
2 CAUTION • Proper site preparation required. • Shed not intended for use in extreme weather conditions. • Shed not intended for storage of amma
20BRear viewRear viewTop viewTop viewBefore proceeding, make sure corner is square (top view) where it meets the floor and that panel is flush (rear v
2112C7Align tabs on bottom of left back panel (C) with slots along oor. Lower back panel into slots and lock in place by sliding panel toward left si
22 Secure panels with two easy bolts (AA), working from floor to roof. DO NOT use torque wrench. Use easy bolt easy driver (HH) and hand tighten. Easy
23 Secure panels with two easy bolts (AA), working from floor to roof. DO NOT use torque wrench. Use easy bolt easy driver (HH) and hand tighten. Easy
24Lock right side panel (E) in place by sliding panel toward rear. Note: Use a rubber mallet to “push” right side panel (E) into locked position.Ve
251E14Tip right side panel (E) back to vertical positionRemettez le panneau latéral droit (E) en position verticale.Incline ligeramente el panel later
26E16AAx2 Secure panels with two easy bolts (AA), working from floor to roof. DO NOT use torque wrench. Use easy bolt easy driver (HH) and hand tighten
27 Assembly–Doors / Ensemble de la remise–Portes / Armado del cobertizo–Puertas21GEE17Insert door latch housing (EE) into right door (G) and snap int
28x22BBG19Stand right door (G) upright with two hinge mounts facing right. Slide one metal hinge plate (BB) onto each hinge mount. Rotate metal hinge
291221CCx2x2Secure each door hinge with one screw (CC).Repeat Steps 20-21 for right door (G).Fixez chaque charnière de porte avec une vis (CC).Répétez
3 Shed Safety and Care • Hot items, such as recently used grills, blowtorches, etc., must not be stored in the shed. • Heavy articles should not b
30 Assembly–Roof / Ensemble de la remise–Murs / Armado del cobertizo–Techo22HGGAttach lock hasp (GG) to bottom of roof (H).Note: You will hear a snap
311x2x2224KKJJx2HAttach remaining hinge assembly (KK) to bottom of roof (H) using two screws.Attachez l’ensemble de charnière restant (KK) sur la surf
32Lower roof (H) and line up both hinge halves (DD) with holes. Press roof into place. You will hear a snap when engaged.Abaissez le toit (H) et align
33Assembly–Roof (continued) / Ensemble de la remise–Toit (suite) / Armado del cobertizo–Techo (continuación)Before proceeding, make sure hinge assembl
341229FFEInsert prop rod (FF) into right side panel (E) and turn clockwise.Insérez un étançon (FF) dans le panneau latéral droit (E) et tournez-le dan
35x231JJx2Secure hinge assembly to side panel with two screws (JJ).Fixez l’ensemble de charnière au panneau latéral avec deux vis (JJ).Asegure el ens
36Assembly–Roof (continued) / Ensemble de la remise–Toit (suite) / Armado del cobertizo–Techo (continuación)Complete.Terminé.Arcón de terraza completa
371Place shelf into shed. Shelf must be completely seated into shelf supports on side and back panels.Note: See page 12 for shelf dimensions.Insérez l
38SUNCAST® Building, Shed and Gazebo Ten Year Limited Warranty Your SUNCAST® Building, Shed or Gazebo has a TEN YEAR LIMITED WARRANTY against product
39Garantie limitée de dix ans pour cabanon, remise ou pavillon SUNCAST® Votre cabanon, remise ou pavillon SUNCAST® est livré(e) avec une GARANTIE LIMI
4 ATTENTION • Il est nécessaire que le terrain soit correctement préparé. • La remise n’est pas prévue pour une utilisation dans des conditions cl
40Garantie limitée de dix ans pour cabanon, remise ou pavillon SUNCAST® Votre cabanon, remise ou pavillon SUNCAST® est livré(e) avec une GARANTIE LIMI
5 Sécurité et entretien de la remise • Les éléments chauds récemment utilisés, tels que les grils, les chalumeaux, etc., ne doivent pas être entrep
6 PRECAUCIÓN • Se requiere preparar apropiadamente el lugar de la instalación. • El cobertizo no ha sido diseñado para ser usado en condiciones cl
7 Seguridad y cuidado del cobertizo • No deben guardarse artículos calientes como parrillas recientemente usadas, sopletes, etc. en el cobertizo.
8FloorPlancherPisoARight back panelPanneau arrière droitPanel trasero derechoDHinge assembly x1 setEnsemble de charnière x11 conjunto de ensamble de l
9RoofToitTechoHRight DoorPorte droitePuerta derechaGLeft DoorPorte gauchePuerta izquierdaF Parts / Pièces / Piezas - Walls and Floor / Portes et toit
Commentaires sur ces manuels